Optimized scheduling of resource-constraints in projects for smart construction

作者:

Highlights:

• An adaptive PSO is to solve the shortest duration problem with limited resources.

• A dynamic AHPSO model is to solve the dynamic planning issue with limited resources.

• Results showed that the designed models are better than the generic approaches.

摘要

•An adaptive PSO is to solve the shortest duration problem with limited resources.•A dynamic AHPSO model is to solve the dynamic planning issue with limited resources.•Results showed that the designed models are better than the generic approaches.

论文关键词:PSO,Heuristic search,Dynamic inertia weight,Network plan,Resource optimization

论文评审过程:Received 20 January 2022, Revised 24 May 2022, Accepted 23 June 2022, Available online 2 July 2022, Version of Record 2 July 2022.