A single-machine scheduling problem with maintenance activities to minimize makespan

作者:

Highlights:

摘要

We study a single-machine scheduling problem with periodic maintenance activity under two maintenance stratagems. Although the scheduling problem with single or periodic maintenance and nonresumable jobs has been well studied, most of past studies considered only one maintenance stratagem. This research deals with a single-machine scheduling problem where the machine should be stopped for maintenance after a fixed periodic interval (T) or after a fixed number of jobs (K) have been processed. The objective is to minimize the makespan for the addressed problem. A two-stage binary integer programming (BIP) model is provided for driving the optimal solution up to 350-job instances. For the large-sized problems, two efficient heuristics are provided for the different combinations of T and K. Computational results show that the proposed algorithm Best-Fit-Butterfly (BBF) performs well because the total average percentage error is below 1%. Once the constraint of the maximum number of jobs (K) processed in the machine’s available time interval (T) is equal or larger than half of jobs, the heuristic Best-Fit-Decreasing (DBF) is strongly recommended.

论文关键词:Scheduling,Periodic maintenance,Binary integer programming

论文评审过程:Available online 3 December 2009.

论文官网地址:https://doi.org/10.1016/j.amc.2009.11.040