Integrated scheduling of resource-constrained flexible manufacturing systems using constraint programming
作者:
Highlights:
• A new constraint programming formulation for the FMS scheduling problem is proposed.
• Machines, tools, as well as empty and loaded AGV trips are taken into account.
• All the FMS critical features are addressed in an integrated way.
• Optimal and good-quality suboptimal solutions were found for the case-studies.
• The transfer/processing times ratio has an important impact on the solution.
摘要
•A new constraint programming formulation for the FMS scheduling problem is proposed.•Machines, tools, as well as empty and loaded AGV trips are taken into account.•All the FMS critical features are addressed in an integrated way.•Optimal and good-quality suboptimal solutions were found for the case-studies.•The transfer/processing times ratio has an important impact on the solution.
论文关键词:Flexible manufacturing systems,Resource-constrained scheduling,Constraint-programming,Automated job-shop
论文评审过程:Author links open overlay panelJuan M.Novas1EnvelopeGabriela P.HenningPersonEnvelope
论文官网地址:https://doi.org/10.1016/j.eswa.2013.09.026