Consideration of human resources in the Mixed-model Sequencing Problem with Work Overload Minimization: Legal provisions and productivity improvement

作者:

Highlights:

• MMSP with work overload minimization and improvement of working conditions.

• Compliance with saturation conditions of workers imposed by collective agreement.

• Increase of work pace factor of workers to reduce production losses.

• Auxiliary processors to complete the required work and to fulfill all conditions.

• Case study linked to the Nissan Powertrain Plant in Barcelona.

摘要

•MMSP with work overload minimization and improvement of working conditions.•Compliance with saturation conditions of workers imposed by collective agreement.•Increase of work pace factor of workers to reduce production losses.•Auxiliary processors to complete the required work and to fulfill all conditions.•Case study linked to the Nissan Powertrain Plant in Barcelona.

论文关键词:Sequencing,Mixed-product line,Work overload,Saturation,Activity factor,Manufacturing operations

论文评审过程:Received 24 March 2015, Revised 30 June 2015, Accepted 17 July 2015, Available online 4 August 2015, Version of Record 6 September 2015.

论文官网地址:https://doi.org/10.1016/j.eswa.2015.07.044