Bi-level plant selection and production allocation model under type-2 fuzzy demand
作者:
Highlights:
• Bi-level programming model with type-2 triangular fuzzy variables is established.
• General expectation reduction method is proposed to reduce type-2 fuzzy variables.
• A parameter is incorporated to reflect varying optimistic-pessimistic degrees.
• Robust parametric optimization method provides an effective decision making way.
• Illustrative example verifies the applicability and effectiveness.
摘要
•Bi-level programming model with type-2 triangular fuzzy variables is established.•General expectation reduction method is proposed to reduce type-2 fuzzy variables.•A parameter is incorporated to reflect varying optimistic-pessimistic degrees.•Robust parametric optimization method provides an effective decision making way.•Illustrative example verifies the applicability and effectiveness.
论文关键词:Bi-level programming,Plant selection and production allocation,Type-2 triangular fuzzy number,General expectation reduction method
论文评审过程:Received 7 October 2016, Revised 22 May 2017, Accepted 23 May 2017, Available online 24 May 2017, Version of Record 26 May 2017.
论文官网地址:https://doi.org/10.1016/j.eswa.2017.05.057