An intelligent scheduling scheme for real-time traffic management using Cooperative Game Theory and AHP-TOPSIS methods for next generation telecommunication networks

作者:

Highlights:

• An Intelligent scheduling scheme is proposed for LTE-A networks.

• Game theory and AHP-TOPSIS methods are integrated to optimize the scheduling.

• It fairly allocate resources among user equipment.

• Active state of the user equipment is decided based on load and channel conditions.

• Results show that consumption of battery life and transmission delay are reduced.

摘要

•An Intelligent scheduling scheme is proposed for LTE-A networks.•Game theory and AHP-TOPSIS methods are integrated to optimize the scheduling.•It fairly allocate resources among user equipment.•Active state of the user equipment is decided based on load and channel conditions.•Results show that consumption of battery life and transmission delay are reduced.

论文关键词:Cooperative Game Theory,AHP-TOPSIS method,LTE,Scheduling,DRX

论文评审过程:Received 22 January 2017, Revised 27 May 2017, Accepted 28 May 2017, Available online 29 May 2017, Version of Record 2 June 2017.

论文官网地址:https://doi.org/10.1016/j.eswa.2017.05.071