Earliness tardiness production planning and scheduling in flexible flowshop systems under finite planning horizon

作者:

Highlights:

摘要

This paper studies a general flexible flowshop scheduling problem to minimize the earliness and tardiness penalties. We consider a finite planning horizon including some equal periods. There is a known demand for each product in each period. The objective in the all periods, except the last period is minimizing the total penalties of E/T which are originated from the less or excess quantity produced as compared with the cumulative undelivered demands. It is assumed that total demands of each product should be delivered at the end of the planning horizon, so the objective of last period is changed to minimizing the total penalties of E/T which are originated from the difference between completion time and final due date. Because of dividing the problem to some subproblems, we can use optimal algorithms (e.g., B&B) to solve the problem and find suboptimal solution in real-size problems. In the solution procedure, using the unused capacities of the past periods for producing the demand of each period, the solution is improved.

论文关键词:Scheduling,Earliness/tardiness measure,Flexible flowshop

论文评审过程:Available online 17 August 2006.

论文官网地址:https://doi.org/10.1016/j.amc.2006.05.188