Multiple criteria R&D project selection and scheduling using fuzzy logic
An optimal time to sleep for an auto-sleep system
A tabu search heuristic for the multi-depot vehicle routing problem
Long range planning in the process industries: A projection approach
The weighted common due date single machine scheduling problem revisited
On solving the continuous data editing problem
A simulated-annealing heuristic for shift scheduling using non-continuously available employees
Optimal algorithm to determine the spare inventory level for a repairable-item inventory system
A continuous approximation for batch arrival queues with threshold
A note about the Abou-El-Ata model