Constructive and composite heuristics for the 2-stage assembly scheduling problem with periodic maintenance and makespan objective
作者:
Highlights:
• Scheduling in a 2-stage assembly with periodic maintenance is studied.
• Two efficient constructive heuristics and two composite heuristics are proposed.
• Different bin packing policies are used to obtain a schedule.
• The heuristics outperform existing methods for the problem.
摘要
•Scheduling in a 2-stage assembly with periodic maintenance is studied.•Two efficient constructive heuristics and two composite heuristics are proposed.•Different bin packing policies are used to obtain a schedule.•The heuristics outperform existing methods for the problem.
论文关键词:Scheduling,Assembly,Makespan,Preventive maintenance,Heuristics
论文评审过程:Received 22 October 2021, Revised 21 January 2022, Accepted 7 June 2022, Available online 20 June 2022, Version of Record 25 June 2022.
论文官网地址:https://doi.org/10.1016/j.eswa.2022.117824